Calendar iCal feed Step 4 implementation summary

Feature plan: Step 1 · Step 2 · Step 3 · Step 4

Debug mode: enabled

Effort study: railspike-effort / v3/calendar_ics_feed; host ledger. Standing P2 enrollment; extended estimates enabled.

Cycle estimate: 0.55

Branch feat/calendar-ics-feed, replayed onto f05cc94 when push access arrived; planning commit ab5c89f, Stage 1 fc4c007. PR #324 (Steps 1–3, Stages 1–2) was merged 2026-11-17. Later stages continue on feat/calendar-ics-routes from 3e1b719, per AGENTS.md follow-up rules. Stage 3 went out in #325, merged 2026-11-17. Stage 4 is on feat/calendar-ics-event-links from 08a8cce.

Step 4 entry

  • Step 3 approved 2026-11-17. Whole-cycle projection 0.55 reaffirmed after the planning commit. Stage originals 0.05/0.12/0.12/0.10/0.10/0.05/0.03 copied from Step 3, non-additive. Claude single exposed rater; R1 hashes not re-verified.

Stage 1 - Google probe

Original estimate: 0.05

Status: partly checked. Stage 2 started before the remaining checks, at the maintainer's request (2026-11-17), with floating times as planned; a shifted time would revise Stage 2's time format.

  • Changes:

    • New docs/plans/calendar_ics_feed/google_probe.ics. Probe A is a tentative event on 2026-11-20 at 19:00 with no time zone. Probe B is a confirmed all-day event from 2026-11-27 to 2026-11-29, with a place and a URL.

  • Verification:

    • Parsed with the Python icalendar package: both events read back with the intended start, end and status. Passed.

    • No line exceeds 75 octets; lines end in CRLF. Passed.

    • Google checks on Ilya's iPhone: pending. The branch cannot be pushed from this session, so the probe has no raw GitHub URL. Revised route: Ilya copies the file to public/ on the zenmemes.com server, so it is served at https://zenmemes.com/google_probe.ics, and removes it afterwards.

  • Checks for Ilya, with results to record here:

    • Subscribe link on the iPhone: passed (maintainer, 2026-11-17). The link opened Google Calendar and offered to add the calendar. Google shows that offer before it fetches the file, so this does not yet show that the events arrived. At 23:40 UTC https://zenmemes.com/google_probe.ics returned 404.

    • "From URL" on calendar.google.com: does the calendar appear?

    • Probe A: shown at 7:00 PM on Fri Nov 20, or shifted?

    • Probe B: three days, Nov 27 to Nov 29, or four?

    • Event-template link: does Google's event form open filled in, at 7:00 PM?

  • Notes:

    • Deviation from Step 3: the probe is served from zenmemes.com instead of a raw GitHub URL, because this session cannot push. Same purpose and scope.

Stage 2 - iCal writer and flag

Original estimate: 0.12

Retrospective: 0.10

  • Changes:

    • New src/ForumRewrite/Calendar/CalendarIcs.php. document() takes event rows shaped like CalendarQuery::eventsBetween, a thread-to-state map from EventStatus, the site URL and a calendar name.

    • All-day events use DATE values with an end the day after the last day. A timed event starts at Event-Time with no zone and ends an hour after that time on its last day.

    • UID is <thread_id>@<host>. STATUS is CONFIRMED for a confirmed event and TENTATIVE otherwise. The DESCRIPTION holds the phrase, the link and the thread URL. Text is escaped, lines are folded at 75 octets on character boundaries, and lines end in CRLF.

    • New flag FORUM_CALENDAR_FEED_ENABLED ("Calendar feed"): site-mutable, on, requires Event support, in the AUTHORING group after Event phrases.

  • Verification:

    • ./v3 test --smoke CalendarIcsTest FeatureFlagEvaluatorTest: 478 passed. Full suite not run.

    • Correction (2026-11-18): CalendarIcsTest was not registered in tests/run.php, so it did not run in Stage 2; the 478 count did not include it. Stage 4 registered it, and all its cases pass. New CalendarIcsTest: one-day, multi-day, timed, timed multi-day across midnight, tentative and confirmed, escaping, the description, folding of Cyrillic text, and skipping rows with a bad date.

    • FeatureFlagEvaluatorTest: both registry lists updated for the new flag.

    • A two-event sample with a long Cyrillic title read back through the Python icalendar package with the intended dates, times, status, title and description.

  • Notes:

    • Step 3 named no end for timed events. Decision: a one-hour length, because Event-Time has no end time and a calendar entry with no end shows as a zero-length tick. New understanding, not changed scope.

    • Nothing reads the flag yet; Stage 3 adds the routes.

  • Estimate details: as planned; the writer was simpler than estimated.

Stage 3 - Feed routes

Original estimate: 0.12

Retrospective: 0.10

  • Trigger: after deploying #324, the maintainer got a 404 at /calendar.ics. That was expected, because #324 had no routes; this stage adds them.

  • Changes:

    • CalendarQuery::eventsBetween also selects event_link and event_when.

    • New CalendarPageController::feed(?string $tag). It reads events from 90 days ago to two years ahead with the grid's query and states, drops declined events, and writes them with CalendarIcs. The site origin comes from TemplateRenderer::requestOrigin(). The calendar name is the site's display name, plus #tag for a tag feed. Returns null while event support or the feed flag is off.

    • Application: /calendar.ics and /calendar/<tag>.ics, checked before the calendar page routes. They send text/calendar; charset=utf-8 with a five-minute public cache, or 404. Both are added to isApplicationRoute. membersOnlyRequestAllowed is unchanged, so members-only sites keep the feed behind sign-in.

  • Verification:

    • ./v3 test --smoke CalendarPageTest CalendarIcsTest: 490 passed. Full suite not run.

    • New CalendarPageTest cases: the feed lists the grid's events with dates relative to today, leaving out declined, anonymous and too-old events; confirmed and tentative status; the tag feed lists only its tag; 404 with event support off and with the feed flag off, while the tag page still works; and on a members-only site, signed-out visitors don't get the feed.

    • Local server with event support on: /calendar.ics returned 200, text/calendar; charset=utf-8, Cache-Control: public, max-age=300. /calendar/general.ics returned 200 and /calendar.ics/ returned 404.

    • zenmemes.com after deploy: /calendar.ics returned 200 text/calendar with 30 events. The maintainer subscribed on his iPhone and Google Calendar showed a ZenMemes all-day event over the right dates (screenshot, 2026-11-17).

    • Found in production: every event's title came through as "Event", because most event threads have no subject. Fixed in Stage 4. Google also showed the thread link as http://, because the subscribe link used webcal://, which Google fetches over HTTP; Stage 5's link will use the HTTPS address.

  • Notes:

    • The Stage 1 time checks are still open. The live feed can now stand in for the probe file.

  • Estimate details: as planned.

Original estimate: 0.10

Retrospective: 0.12

  • Changes:

    • Production fix: CalendarIcs::title() names an event with the thread's display title, the one the grid shows (ThreadTitle::displayTitle over subject and text), so threads with no subject no longer arrive as "Event".

    • CalendarQuery::eventForThread() returns one listed, unretracted thread's event, sharing the select with eventsBetween. Like the event block, it doesn't require an approved author.

    • CalendarPageController::eventFile(), and the /threads/<id>.ics route ahead of the thread route. It sends text/calendar as a download, or falls through to the normal 404.

    • CalendarIcs::googleEventUrl() builds Google's filled event form, with dates that have no time zone, like the feed.

    • New templates/partials/event_calendar_links.php, shown after the event block in thread_root_card.php. That partial only appears on thread pages, so board rows and cards are unchanged. It reads "Add to Google Calendar · .ics" and appears only while event support and the feed flag are on, and never for a retracted post. The renderer exposes calendarFeedEnabled.

    • tests/run.php registers CalendarIcsTest.

  • Verification:

    • ./v3 test --smoke CalendarPageTest CalendarIcsTest: smoke 492 passed, and CalendarIcsTest on its own 10 passed. It was not in the smoke run because it was registered after that run. Full suite not run.

    • New cases: a title taken from the text when there is no subject; the Google link for all-day and timed events; the thread page shows the links, while a plain thread and the board don't; the .ics file of an anonymous author's event has one event with its title; a thread with no event and an unknown thread both return 404; with the feed off, the event block stays but the links and file are gone.

  • Notes:

    • The Google link leaves out the thread address. Thread pages are cached HTML that must be the same for every visitor, and the origin isn't known when the page is built. The .ics file includes the address, because it is built per request.

  • Estimate details: a bit over, because of the production title fix and the missing test registration.

Stage 5 - Subscribe panel

Original estimate: 0.10

Retrospective: 0.08

  • Approval: on 2026-11-18 the maintainer asked us to finish the remaining stages without waiting for his approval.

  • Changes:

    • templates/pages/calendar.php: a closed <details> Subscribe panel under the month links, shown while the feed flag is on. It holds Add to Google Calendar, "Other calendar apps" (webcal:), the .ics link, the feed address in a read-only field, and one line about Google's refresh delay. A tag calendar offers its own tag feed.

    • A script fills the absolute feed address from location.origin before paint. Cached pages stay identical for every visitor, and a page on HTTPS gives Google an HTTPS address, which avoids the webcal: plain-HTTP fetch seen in Stage 3. Without script, the .ics link and the relative address remain, and the Google and app links stay hidden.

    • public/assets/calendar.css: panel spacing, and a 16px address field so iPhone Safari doesn't zoom.

  • Verification:

    • ./v3 test CalendarPageTest: 15 passed. New case: the panel on /calendar and /calendar/couches names each page's own feed, and is absent with the feed flag or event support off.

    • node tests/browser/calendar.mjs: passed. New checks: at 390px and 1280px the panel starts closed, opens with the page-origin address and with Google and webcal: links, and still fits the width; the feed fetches as an iCal document. Without JavaScript, the .ics link and the relative address remain and the Google link is hidden. The existing theme sweep (Light, Dark, Chicago, Midnight, Word97 at both widths) still fits.

    • Looked at the 390px screenshot with the panel open: it sits under the month links and fits the card.

  • Notes:

    • Deviation from Step 3: no copy button, so no copy code moved out of the Prompts page. Stage 1 showed the Google link works on the iPhone, which makes the address a fallback, and a read-only field can be selected and copied by hand. That follows the AGENTS.md guidance to keep UI minimal and avoids touching the Prompts page. A copy button can follow if the field proves awkward.

    • Google is given an https: feed address in its subscribe link. Stage 1 only tested the webcal: form, so this is checked in Stage 7.

  • Estimate details: smaller than planned, without the copy-code move.

Stage 6 - Documentation and concepts

Original estimate: 0.05

Retrospective: 0.05

  • Changes:

    • docs/reference/calendar.md: new "Subscribing" section covering the feeds, the window and states, event identity and naming, timing, the Subscribe panel, per-event links and file, members-only behaviour, and the flag.

    • docs/concepts/calendar.md: "export" removed from the Boundary, which now points to the new concept.

    • New docs/concepts/calendar_feed.md (purpose, scenario, sources, boundary).

    • docs/reference/agent_api.md: the three iCal reads, in the Events section.

    • docs/plans/README.md: entry updated to the delivered state.

  • Verification:

    • Every relative link in the new concept file resolves; git diff --check is clean.

    • Concept entries checked against delivered behaviour: no full-inventory audit.

  • Notes: documentation only; runtime checks not applicable.

Stage 7 - Production check on the maintainer's iPhone

Original estimate: 0.03

Status: pending maintainer. This needs Stages 4–5 deployed, after this PR is merged.

  • Already shown (Stage 3, 2026-11-17): Google Calendar on the iPhone subscribed to /calendar.ics and showed a ZenMemes all-day event over the right dates.

  • Still to check after deploy:

    • Event titles appear in Google (not "Event") after Google's next refresh.

    • A timed event shows at the time written. This is the open Stage 1 time-zone risk; no ZenMemes event with a time was seen yet.

    • Subscribe → Add to Google Calendar on /calendar works on the phone with the https: address.

    • "Add to Google Calendar" on an event thread opens a filled form.

  • No retrospective until the check is done.

Final verification

  • Planned stages: Stages 1–6 complete and committed; Stage 7 pending the maintainer's phone check after deploy.

  • Stage commits: planning ab5c89f; Stage 1 fc4c007; Stage 2 377d149; Stage 3 de1d6d9; Stage 4 349afb5; Stage 5 c58b592; Stage 6 6bb5e0d. Seven commits across three PRs (#324, #325, #326) for six completed stages: passed (needs at least 1 + 6).

  • Planning commit holds only approved plans, the debug log and the index entry: passed.

  • Completion Contract:

    • Normal entry, the Subscribe panel and event-thread links: passed locally (browser test).

    • End-to-end subscription: partly passed on production (Stage 3 screenshot); the rest is pending Stage 7.

    • Recovery, the copyable address and the refresh note: passed locally.

    • Deployment, no schema or dependency change: passed.

  • Tests: ./v3 test --smoke CalendarPageTest CalendarIcsTest FeatureFlagEvaluatorTest, 503 passed; node tests/browser/calendar.mjs passed. Full suite not run, per AGENTS.md. No baseline failures found.

  • Dependencies: none added. playwright-core@1.58.1, already declared in package.json, was installed outside the repository (--no-save) to run the browser test.

  • Final diff review over src, templates, public and tests for this branch: no stray changes. /threads/<id>.ics falls through to the normal thread route, giving a 404 when there is no event.

  • Shared consumers: thread_root_card.php is used only by thread.php; event_block.php is unchanged; the calendar page script is shared by the grid only.

  • Themes: the browser test's theme sweep (Light, Dark, Chicago, Midnight, Word97) fits at 390px and 1280px. No navigation destination was added, so no nav icons were needed.

  • Feedback items: none.

Cycle retrospective

Cycle estimate: 0.55

Retrospective: 0.55

  • The production fixes (event titles, test registration) and the three-PR split added work. Dropping the copy button saved some.

  • Maintainer comfortable-fit judgment: pending.

— Claude · 2026-11-17 UTC · Model: Claude Opus 5.5