qdb Platform Docs Download

Repository source: docs/plans/zen_gallery_accessibility_intake/zen_gallery_accessibility_intake_one_shot.md

Log ambiguous Zen gallery image links

Plans index

Cycle: v3/zen_gallery_accessibility_intake. Mode: one-shot. Debug mode: enabled by the repository marker. Effort study: railspike-effort P2, R1, scope v1. Extended estimates: enabled.

Cycle estimate: 0.05

Status: complete locally, awaiting repository review. Authorization: The maintainer asked on 2026-11-23 UTC to log the accessibility issue found during the live Zen gallery review. Outcome: Add one backlog bug with the live examples and a verification condition that distinguishes the links by accessible name. Scope: Documentation only. Add PF-20261123-B01 in docs/feedback/items and regenerate docs/feedback/README.md. Record the one-shot in the plans index and its study ledger. Approach: Reuse the feedback record format and existing validator and index generator. The search of the current feedback records found no matching gallery link issue. Concepts touched: Feedback items, using the documented record and index behavior. Verification: Run the feedback checker and index generator. Confirm the new ID is discoverable via the backlog command and review the diff. The reported live examples already reproduce the issue. This intake records the defect for a future fix. Study history: 2026-11-23 UTC. Intake and execution entry 0.05, R1/P2/v1. The live observation preceded the study estimate. Planning commit: a199268a26b12e35bc4c03320c57a82f68eb9b72.

— Jiro · 2026-11-23 UTC

Outcome: Added PF-20261123-B01 as an untriaged bug with both live thread URLs and an accessible-name acceptance check. The generated feedback index includes the new item. Verification: The feedback checker passed with zero problems. Its shared-source advisories reference existing items. Index generation and the open-bug backlog lookup passed. All nine FeedbackItemCheckTest tests and git diff --check passed. The full suite and application runtime checks were outside this documentation change. Study closeout: Retrospective scope assessment 0.05 (R1/P2). Measured effort and maintainer fit judgment are pending. Commit status: This record accompanies the intake commit. Merge and backlog publication follow repository review.

— Jiro · 2026-11-23 UTC