Repository source: docs/plans/feedback_completion_20261124/feedback_completion_20261124_one_shot.md
Cycle: v3/feedback_completion_20261124; Mode: one-shot; Index: ../README.md Debug mode: enabled (project marker) Effort study: railspike-effort; R1 / P2; standing enrollment; ledger: ../effort_ledger/feedback_completion_20261124.md Extended estimates: enabled
Cycle estimate: 0.85
Status: complete for the authorized proposals-only sweep; PR #404 open; item acceptance pending Original request: Run a history-only completion sweep of the v3 feedback backlog, checking every blocked item first, then untriaged/ready records mentioning PRs, merges or deployment, then remaining untriaged records. Record application commit and history range. Propose groups A (done), B (shipped, maintainer acceptance), C (built, merge/deployment pending), D (built claim unresolved). Open a PR. Do not change any item before acceptance. Authorization: User explicitly requests repository work and an open PR, 2026-11-24. No item transitions, import, new feedback, deployment or production writes authorized. Outcome and work type: Documentation only. Allowed paths: docs/feedback/triage/2026-11-24_proposals.txt, this cycle folder, docs/plans/README.md entry and docs/plans/effort_ledger/feedback_completion_20261124.md. Item files and generated index remain unchanged. Reuse decisions: Follow docs/agents/feedback_triage.md sections 2, 5 and 6. Reuse the dated inventory shape from docs/feedback/triage/2026-11-05_completion_reconciliation.txt and existing Workflow/Evidence fields. docs/concepts/feedback_items.md remains accurate; no inventory change needed. Concepts touched: Feedback items, used unchanged. No application contracts or new tracker. Starting revision: d4ddcb3fc44baf6d8f6bf66662137722c440819b (freshly fetched origin/main); full clone, not shallow. Branch: audit/feedback-completion-20261124 Approach: Pin main and live versions, inspect all records, search full history including before migration, check ancestry and later corrective commits, inspect current code/tests and available public endpoints. Keep unresolved matches visible. Risks: A merged implementation may be superseded or incomplete. Check retained Done when and later history. A live version proves deployment ancestry, not acceptance or active configuration. Separate these claims. Avoid treating absent exact mentions as missing implementation. Completion conditions: Reviewable proposals with all requested records covered, group choices and concrete next actions; no item edits; committed branch and open PR. Readers can accept groups or request corrections before any transitions. Verification and recovery plan: Run feedback check, smoke tests, diff and file-scope checks. Validate references and proposal counts. Read-only live API/HTML checks support only stated claims. Physical-device and privileged checks remain explicitly unverified. No full suite. Correct proposals in this file/PR without changing items. Dependencies: zero additions or updates; no dependency approval needed. Study intake: 2026-11-24; 0.85, single exposed Codex rater after reading procedures and counts, before item implementation inspection. Pristine intake missing. R1 source hashes not re-verified; bundled R1 definitions read. No measured effort or acceptance inferred. Study execution entry: 2026-11-24; 0.85 reaffirmed, scope v1/R1/P2; no artificial stages or additive scores. Attribution: Codex; 2026-11-24 UTC.
Planning commit: 4da4faa50027610654830b9e42c2290ef55c5fde (confirmed planning-only commit before the proposals file was created).
Dated execution history: 2026-11-24: Access gate passed before writing: existing full Git clone with correct origin, fresh fetch and successful git push --dry-run. Working tree was clean. No access-check branch was actually pushed. 2026-11-24: Inspected all 362 records. Audit order: 66 blocked; 22 broad note leads (17 substantive leads, five wording-only matches); 260 remaining untriaged; three other ready records. Eleven closed headers counted, not reopened. 2026-11-24: Searched 5,706 available commits by item ID, source post IDs and outcome wording, including pre-migration history and remote-only work. Scanned changed plan prose in c2b3ee1a..d4ddcb3f for PF references. Read retained completion boundaries and later corrections before proposing transitions. 2026-11-24: Pinned application d4ddcb3fc44baf6d8f6bf66662137722c440819b. Both public version sources report b4a4eec4e7cbb9083f164dbdfea5f340785d8f96 (backlog uses short form). Each proposal implementation passed ancestry against main and live. 2026-11-24: Original notes claiming merge/push blockage are stale for the identified blocked implementations. No C proposal remains. Remote-only Chicago styling and historical rebased copies are retained as leads, not substituted for current merged work. 2026-11-24: Preserved partial/superseded acceptance: reply focus contrary report, author-only API slice, square-crop thumbnail conflict and calendar approval-label exception. Shared zoom buttons do not establish shared stepping. 2026-11-24: Live read-only Chrome and HTTP checks corroborated the public flows described in the proposals. No posting, importing, deployment, feature setting, item change or generated index write occurred. 2026-11-24: A targeted historical thread route returned HTTP 503 for both URL forms. Kept that item open instead of inferring recovery from another readable thread. 2026-11-24: An apparent Auto-theme failure was rejected as regression evidence when an independent media-query listener received no CDP change events. Real device scheme-change acceptance remains in B. 2026-11-24: User asked, "shoot, please confirm railspike is at v0.7.0-beta.2". Disposition: in-scope read-only confirmation. RAILSPIKE_SOURCE.md and host workflow both pin v0.6.1-beta.1, upstream commit 5d54e065fa5f9f6e2555977034b5073456dd104c. Reported that fact; no upgrade requested or performed.
Outcome: docs/feedback/triage/2026-11-24_proposals.txt is awaiting review. A: 36 done proposals. B: 42 shipped/acceptance proposals. C: zero. D: four unresolved built-outcome corrections. Ten additional investigated candidates retain current fields. All 351 open records have inventory coverage. Proposed count effect: if all proposed groups are accepted, 262 untriaged, three ready, 50 blocked and 42 done; declined/duplicate stay three/two. This is a projection, not a current backlog change. Remaining authorized work: commit, push and open PR. Acceptance and item writes belong to a later reviewed action under feedback_triage section 6.
Verification: Passed: ./v3 feedback check, 362 records, zero problems. All 36 Review lines read; preserve shared sources/split outcomes and do not infer duplicates. Failed with limits: smoke plus ten targeted classes, 576 run, 567 passed, nine failed. Exact command and failure names are in the proposals. These occurred on unchanged audited application source. The Unicode/emoji portability item is already open; session-store lock failure was not diagnosed. No application fixes authorized here. Passed: focused title/replay/import-progress/preferences/known-instance/zoom/worker checks, 69/69; publisher CLI/HTTP plus offline-compose checks, 26/26; Recent and browser-signing checks, 99/99. Exact commands are in the proposals. Passed: ordinary ./v3 feedback list and ./v3 publish-keys --help; no production publication. Passed: live read-only source repository links, text policy, author headers, client byte equality, public page navigation, two-tab keystroke network check, seven-theme Outbox typography, three-theme Like/Flag typography, Options/Event controls, URL hint reload cleanup and bottom Tools card. Unverified: physical phone and Safari/Firefox acceptance, three historical Node browser runners (playwright-core absent), production authenticated/privileged writes, actual imports/deployments, external artifact/installed skill state. No dependency installed. These limits remain in per-item findings. Not run: full suite. UI application changes, schema migration and deployment checks are inapplicable to this documentation-only change; stated live evidence was checked read-only. Passed: all proposal commit references resolve and are ancestors of main/live; every named evidence path exists; all open records covered; group counts and projected counts checked; canonical items, generated index, application source/tests and todo.txt unchanged. Passed: git diff --check and final allowed-file-scope review. No dependency delta. No concept inventory change; Feedback items concept still describes this proposal-before-write workflow accurately. Recovery: correct the awaiting-review proposals in the PR. Do not apply transitions or regenerate the feedback index before group acceptance.
Study closeout: 2026-11-24; scope v1/R1/P2. Intake and entry 0.85 preserved. Retrospective cycle scope: 0.95, single exposed Codex rater. The wider evidence review is an execution discovery within the original scope, not a new feature request. No measured labor, independent rating, maintainer fit judgment or accepted-outcome increment. Commit/merge/publication status: planning committed; completion commit pending; no merge or deployment authorized. PR opening is authorized and pending. Attribution: Codex; 2026-11-24 UTC.
2026-11-24 18:24 UTC handoff: completion commit 9f8df7b04e86f58a8a4be1d5ac68703655d5668c contains the proposals and updated cycle records. Pushed branch audit/feedback-completion-20261124 and opened https://github.com/gulkily/v3/pull/404 . GitHub reports OPEN, MERGEABLE, CLEAN. No merge or deployment performed. Final outcome: authorized sweep and PR complete. Proposed item transitions and maintainer acceptance remain pending by design; no canonical item, generated index or todo change. This append supersedes earlier pending commit/PR handoff lines without rewriting their execution history. Final verification: all five changed paths are inside the allowed documentation scope. git diff --check origin/main...HEAD passed. Working tree was clean after the completion commit. The PR contains the planning gate before the proposals commit. Full suite was not run.