Cycle v3/zen_strip

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/zen_stripStep 4 complete; review pendingv2 / R1 / P20.70 (Step 4 entry); retrospective 0.55Step 1, Step 2, Step 3, Step 4No parent; maintainer judgment pending

2026-11-19 — Standing P2 enrollment. Intake 0.50 after code inspection (no pristine intake), single exposed Claude rater. Step 1 alternatives A 0.50, B 0.70, C 0.90 (not summed). Baseline eb0f5177.

2026-11-19 — Maintainer switched Step 1 to Option B (scope v2). Projected total 0.70, single exposed Claude rater. Awaiting approval.

2026-11-19 — Step 1 approved with Option B. Step 2 handoff 0.70 reaffirmed, single exposed Claude rater. Offline strip deferred.

2026-11-20 — Step 2 revised: tagline dropped, tag pages unchanged. Projected total 0.70 unchanged.

2026-11-20 — Step 2 approved. Step 3 handoff 0.70 reaffirmed, single exposed Claude rater.

2026-11-20 — Step 3 approved. Step 4 entry 0.70 reaffirmed; five stages committed. Retrospective scope assessment 0.55, single exposed Claude rater. Maintainer judgment pending; measured time unknown.