Repository source: docs/plans/effort_ledger/zen_strip.md
Cycle v3/zen_strip
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/zen_strip | Step 4 complete; review pending | v2 / R1 / P2 | 0.70 (Step 4 entry); retrospective 0.55 | Step 1, Step 2, Step 3, Step 4 | No parent; maintainer judgment pending |
2026-11-19 — Standing P2 enrollment. Intake 0.50 after code inspection (no pristine intake), single exposed Claude rater. Step 1 alternatives A 0.50, B 0.70, C 0.90 (not summed). Baseline eb0f5177.
2026-11-19 — Maintainer switched Step 1 to Option B (scope v2). Projected total 0.70, single exposed Claude rater. Awaiting approval.
2026-11-19 — Step 1 approved with Option B. Step 2 handoff 0.70 reaffirmed, single exposed Claude rater. Offline strip deferred.
2026-11-20 — Step 2 revised: tagline dropped, tag pages unchanged. Projected total 0.70 unchanged.
2026-11-20 — Step 2 approved. Step 3 handoff 0.70 reaffirmed, single exposed Claude rater.
2026-11-20 — Step 3 approved. Step 4 entry 0.70 reaffirmed; five stages committed. Retrospective scope assessment 0.55, single exposed Claude rater. Maintainer judgment pending; measured time unknown.