Repository source: docs/plans/effort_ledger/zen_hero.md
Cycle v3/zen_hero
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/zen_hero | Step 4 complete; not pushed; review pending | v1 / R1 / P2 | 0.35 (Steps 1–4); retrospective 0.35 | Step 1, Step 2, Step 3, Step 4 | Follows v3/zen_strip_grid; maintainer judgment pending |
2026-11-21 — Step 1. Intake and handoff 0.35 for Option A (B 0.50, C 0.65; alternatives, not summed). Single exposed Claude rater. Measured time unknown.
2026-11-21 — Step 1 approved (Option A assumed). Step 2 handoff 0.35, reaffirmed. Single exposed Claude rater.
2026-11-21 — Step 2 approved. Step 3 handoff 0.35, reaffirmed. Stage work: 0.10, 0.05, 0.15, 0.10, 0.05 (not summed).
2026-11-21 — Step 3 approved after the home-page-only revision. Step 4 entry 0.35; retrospective scope assessment 0.35. Stage retrospectives: 0.10, 0.05, 0.15, 0.10, 0.05. Maintainer judgment pending. Measured time unknown.