Repository source: docs/plans/effort_ledger/thread_author_details.md
Cycle v3/thread_author_details
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/thread_author_details | Locally verified; PR sign-in pending | v1 / R1 / P2 | 0.20 | record | No parent; maintainer comfortable-fit/acceptance pending |
2026-11-21 intake: 0.20 after source/feedback inspection; no pristine intake reconstructed. Standing P2 enrollment; R1 three frozen hashes verified. Orange single exposed rater; scope v1, baseline 22fc9f10a4d4f8cba9ecaed501aba2ea90d129e4. No measured labor or independent rating.
2026-11-21 execution entry: 0.20 reaffirmed; scope, baseline, R1/P2 and exposure unchanged. One bounded pass, no invented stages.
2026-11-21 closeout: original projection 0.20 retained; separate retrospective scope assessment 0.25. Final smoke plus focused tests 485/485; local HTTP baseline compatibility passed. Query-plan inspection confirms existing indexes; no large-thread latency claim. No new schema or repository dependencies. Initial source-column mistake and environment ZIP recovery are retained in the record. PR publication, deployment and maintainer acceptance remain pending. No split, measured labor or accepted-count increment.