Cycle v3/private_key_access

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/private_key_accessStep 4: Stages 1–7 committed; Stage 8 (production) pending maintainerv2 / R1 / P20.95 (intake 0.80; Step 1 0.80; Revision 1 0.90; Step 2 0.90; Step 3 0.95)Step 1, Step 2, Step 3, Step 4New cycle; no parent; prerequisite for v3/private_group_chats

2026-11-24T17:10:00Z — v3/private_key_access Step 1 handoff (standing P2 enrollment, no parent): assessment/checkpoint. Scope v1, recommended Option A (private access worked out from approval receipts plus a signed confirm record; existing failing keys downgraded). Starting revision 2d7805c8, R1/P2; R1 hashes not re-verified. Pristine intake missing; intake and projected total 0.80; options A 0.80, B 0.90, C 0.50, D 0.05, non-additive. Single exposed Claude rater. Await Approved Step 1.

2026-11-24T17:20:00Z — v3/private_key_access Step 1 Revision 1: maintainer asked how an owner learns a key is waiting; added the device line, short code, QR confirm link, Confirm/Not me card and operator path. Scope v2; projected total 0.80 → 0.90 (changed scope). Same R1/P2, single exposed Claude rater. Await Approved Step 1.

2026-11-24T17:35:00Z — v3/private_key_access Step 2 handoff: Step 1 (Option A with Revision 1) approved. Description/checkpoint. Projected total 0.90 reaffirmed, scope v2. Same R1/P2, single exposed Claude rater. Await Approved Step 2.

2026-11-24T17:55:00Z — v3/private_key_access Step 3 handoff: Step 2 approved. Plan/checkpoint. Eight stages. Projected total 0.90 → 0.95 (new understanding, same scope v2: report command, confirm route and QR landing). Stage work 0.15/0.15/0.15/0.10/0.12/0.08/0.05/0.05, non-additive. Same R1/P2, single exposed Claude rater. Await Approved Step 3.

2026-11-24T17:40:00Z — v3/private_key_access Step 4 entry: Step 3 approved; branch feat/private-key-access from 2d7805c8, planning 14c370810. Summary. Projection 0.95 reaffirmed; stage originals 0.15/0.15/0.15/0.10/0.12/0.08/0.05/0.05, non-additive. Stage 1 retrospective 0.15.

2026-11-24T19:40:00Z — v3/private_key_access Step 4 closeout (Stages 1–7): summary. Stage retrospectives 0.15/0.15/0.15/0.12/0.15/0.08/0.05, Stage 8 pending; non-additive. Cycle projection 0.95; cycle retrospective 1.00 (Stages 1–7). Maintainer comfortable-fit judgment pending. Same R1/P2, single exposed Claude rater.