Repository source: docs/plans/effort_ledger/post_menu_outside_close.md
Cycle v3/post_menu_outside_close
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/post_menu_outside_close | Locally complete; deployment and acceptance pending | v1 / R1 / P2 | 0.10 | record | PF-20261111-F32; no parent; acceptance pending |
2026-11-22 — Standing P2 enrollment. Intake 0.10 after reading the menu scripts (pristine estimate missing); execution entry 0.10 reaffirmed. Single exposed Claude rater; R1 hashes verified. Baseline e2c112ca.
2026-11-22 closeout: retrospective 0.10, projection unchanged. Outside click closes the post "…" menu; browser test and a real-page check pass at desktop and phone. Smoke failures are baseline. Full suite not run. No accepted-count change.