Cycle v3/post_menu_outside_close

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/post_menu_outside_closeLocally complete; deployment and acceptance pendingv1 / R1 / P20.10recordPF-20261111-F32; no parent; acceptance pending

2026-11-22 — Standing P2 enrollment. Intake 0.10 after reading the menu scripts (pristine estimate missing); execution entry 0.10 reaffirmed. Single exposed Claude rater; R1 hashes verified. Baseline e2c112ca. 2026-11-22 closeout: retrospective 0.10, projection unchanged. Outside click closes the post "…" menu; browser test and a real-page check pass at desktop and phone. Smoke failures are baseline. Full suite not run. No accepted-count change.