Repository source: docs/plans/effort_ledger/post_approval_label.md
Cycle v3/post_approval_label
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/post_approval_label | One-shot complete; review, merge and deployment pending | v1 / R1 / P2 | 0.08 | Record study history | New cycle; no parent. Comfortable-fit judgment pending maintainer |
2026-11-18T07:04:00Z — v3/post_approval_label one-shot intake (standing P2 enrollment, no parent): projection 0.08, scope v1, starting revision 31e16b06. Pristine intake missing (recorded after inspection). Single exposed Claude rater.
2026-11-18T07:05:00Z — execution entry after planning commit a8487ae: 0.08 reaffirmed.
2026-11-18T07:10:00Z — closeout: delivered scope v1; retrospective 0.07. Maintainer fit and acceptance pending.