Cycle v3/per_cycle_effort_ledger

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/per_cycle_effort_ledgerOne-shot technically complete; PR and maintainer acceptance pendingv1 / R1 / P20.10 (intake 0.10; execution entry 0.10; retrospective 0.10)recordIn-session request; acceptance pending

2026-11-15: standing P2 enrollment, one-shot on the maintainer's in-session request. Intake 0.10 after inspecting the ledger and the open PRs' conflicts (no pristine intake), execution entry reaffirmed, retrospective 0.10. Baseline 90d3b0f; branch chore/per_cycle_effort_ledger; planning commit 616e7bf. First cycle indexed in its own ledger file. Single exposed rater Claude (claude-opus-5-5). No measured effort, independent rating or accepted-count increment.