Cycle v3/mitrapclub_music

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/mitrapclub_musicStep 4 complete through Stage 6; Stage 7 pending deploy; PR openv1 / R1 / P20.55 (Option B, revised)Step 1, Step 2, Step 3New cycle; maintainer judgment pending

2026-11-25 — Step 1. Intake and handoff 0.45 for Option B (A 0.10, C 0.55, D 0.10; alternatives, not summed). Single exposed Claude rater. Measured time unknown.

2026-11-25 — Step 1 approved (Option B assumed, Step 1 defaults). Step 2 handoff 0.45, reaffirmed. Single exposed Claude rater.

2026-11-25 — Step 2 approved, then revised: titles fetched for every supported embed. Revised projected total 0.55. Awaiting re-approval.

2026-11-25 — Step 2 (revised) approved. Step 3 handoff 0.55, reaffirmed. Stage work: 0.15, 0.10, 0.10, 0.10, 0.05, 0.05, 0.10 (not summed). Single exposed Claude rater.

2026-11-25 — Step 3 revised: first-line titles behind a flag, off by default. Projected total 0.55, unchanged.

2026-11-25 — Step 3 approved. Step 4 entry 0.55, reaffirmed. Stage 1 retrospective 0.15.

  • Stage 2 retrospective 0.10.

  • Stage 3 retrospective 0.10.

  • Stage 4 retrospective 0.15 (original 0.10): row title beacon and a new browser test.

  • Stage 5 retrospective 0.10 (original 0.05): icons and a pre-existing nav_slots.mjs fix.

  • Stage 6 retrospective 0.05.

  • 2026-11-25 — Step 4 closeout: retrospective scope assessment 0.60 (Stages 4 and 5 over). Stage 7 pending deploy. Maintainer judgment pending. Measured time unknown.