Cycle v3/local_start_port_fallback

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/local_start_port_fallbackTechnically complete locally; merge and maintainer acceptance pendingv1 / R1 / P20.25; retrospective 0.25One-shot recordPF-20261021-F07; no parent cycle; acceptance pending

2026-11-21 intake: Standing P2 enrollment. Codex single exposed rater, projection 0.25 after investigation and source/test inspection. Pristine intake missing. Baseline b4ed31a48, scope v1, all three frozen R1 hashes verified against their manifest. Historical feedback estimate 0.2 is separate. 2026-11-21 execution entry: Reaffirm 0.25, same v1, baseline, R1/P2 and exposure. Planning commit cdaf343dc precedes implementation. No independent rating or measured labor. 2026-11-21 closeout: Retrospective scope assessment 0.25. One bounded work unit completed without scope expansion or split. Startup/worker/log tests 15/15; frontend consumers 14/14; smoke 492/496, four baseline failures reproduced. Workspace port collision, exhaustion, retry, terminal and cancellation replay passed. Full suite not run; no deployment or push. Maintainer comfortable-fit judgment and acceptance pending; no accepted-count increment.