Cycle v3/local_import_status

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/local_import_statusStep 4 complete; PR #370 openv1 / R1 / P20.25 (Steps 1–4); retrospective 0.27Step 1, Step 2, Step 3, Step 4Follows v3/local_import_progress (PR #357, merged); maintainer judgment pending

2026-11-22 — Step 1. Intake and handoff 0.25 for Option A (B 0.40, C 0.40; alternatives, not summed). Single exposed Claude rater. Measured time unknown.

2026-11-22 — Step 1 approved (Option A assumed). Step 2 handoff 0.25, reaffirmed. Single exposed Claude rater.

2026-11-22 — Step 2 approved. Step 3 handoff 0.25, reaffirmed. Stage work: 0.08, 0.07, 0.07, 0.06 (not summed).

2026-11-22 — Step 3 approved. Step 4 entry 0.25, reaffirmed. Branch feat/local_import_status, planning commit 773c31c.

2026-11-22 — Step 4 closeout. Retrospective scope assessment 0.27 against 0.25. Stage retrospectives: 0.06, 0.07, 0.10, 0.06. Maintainer judgment pending. Measured time unknown.