Repository source: docs/plans/effort_ledger/local_import_progress.md
Cycle v3/local_import_progress
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/local_import_progress | Step 4 complete; PR #357 open | v1 / R1 / P2 | 0.40 (Steps 1–4); retrospective 0.48 | Step 1, Step 2, Step 3, Step 4 | Follows v3/local_start_import and v3/import_without_worker; maintainer judgment pending |
2026-11-22 — Step 1. Intake (after code inspection) and handoff 0.40 for Option A (B 0.25, C 0.20, D 0.08; alternatives, not summed). Single exposed Claude rater. Measured time unknown.
2026-11-22 — Step 1 approved (Option A assumed). Step 2 handoff 0.40, reaffirmed. Single exposed Claude rater.
2026-11-22 — Step 2 approved. Step 3 handoff 0.40, reaffirmed. Stage work: 0.10, 0.10, 0.08, 0.08, 0.08 (not summed).
2026-11-22 — Step 3 approved. Step 4 entry 0.40, reaffirmed. Branch feat/local_import_progress, planning commit 44368a4.
2026-11-22 — Step 4 closeout. Retrospective scope assessment 0.48 against 0.40. Stage retrospectives: 0.09, 0.14, 0.08, 0.12, 0.07. Maintainer judgment pending. Measured time unknown.