Cycle v3/linkedin_contacts_crm

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/linkedin_contacts_crmImplemented, ZIP verification pendingv1 / R1 / P20.70 (Step 1: 0.65)Step 1 · Step 2 · Step 3 · Step 4New cycle / pending

2026-11-23 UTC. Standing enrollment under P2. Intake exposure disclosed in the assessment. Step 1 projection 0.65 for A. Extended estimates enabled. Jiro single exposed rater. Verified all three R1 source hashes. Baseline 9ae843cf6c433c95bb44c914b651b72e79e8b377.

2026-11-23 UTC. User approved Step 1 (Option A). Step 2 projection 0.70, revised for newly understood handling of exports without profile URLs and verification with and without PHP ZIP support. Scope v1 and baseline unchanged. Jiro single exposed rater. Verified all three R1 source hashes.

2026-11-23 UTC. User approved Step 2. Step 3 projection 0.70 reaffirmed for seven stages covering local launch, CSV preview, durable confirmation, safe reimport, ZIP recovery, contact edits, and backup and release isolation. Scope v1 and baseline unchanged. Jiro single exposed rater. Verified all three R1 source hashes.

2026-11-23 UTC. Step 4 entry reaffirmed 0.70. Application stages and CSV verification are complete. Direct ZIP and ZIP-backed artifact verification remain pending, alongside maintainer acceptance.