Cycle v3/key_approval_api
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/key_approval_api | Step 4 Stages 1–5 committed; post-deploy check and comfortable-fit judgment pending maintainer | v2 / R1 / P2 | 0.55 (intake 0.35; Step 1 Revision 1 0.55; Step 3 0.55) | Step 1, Step 2, Step 3, Step 4 | New cycle; no parent |
2026-11-18T02:40:00Z — v3/key_approval_api Step 1 handoff (standing P2 enrollment, no parent): scope v1, recommended Option B (docs plus pending_keys and Author-Identity-ID). Starting revision 5508257, R1/P2; R1 hashes not re-verified. Pristine intake missing; intake and projected total 0.35; options A 0.15, B 0.35, C 0.60, non-additive. Single exposed Claude rater.
2026-11-18T02:45:00Z — Step 1 Revision 1: maintainer chose Option C. Scope v2 (adds quill.py pending and approve). Projected total 0.35 → 0.55 (changed scope; C re-rated 0.60 → 0.55 after finding no client ports exist). Same R1/P2, single exposed Claude rater.
2026-11-18T02:55:00Z — Step 2 handoff: Step 1 Revision 1 approved. Projected total 0.55 reaffirmed.
2026-11-18T03:05:00Z — Step 3 handoff: Step 2 approved. Five stages; stage work 0.10/0.08/0.10/0.15/0.10, non-additive. Projected total 0.55 reaffirmed.
2026-11-18T03:10:00Z — Step 4 entry: Step 3 approved; branch feat/key-approval-api from 5508257, planning 520141a. Projection 0.55 reaffirmed.
2026-11-18T03:45:00Z — Step 4 closeout: summary. Stages 1–5 committed. Stage retrospectives 0.10/0.08/0.10/0.15/0.10. Scope narrowed in Stage 2 (get_thread left unchanged). Cycle projection 0.55; cycle retrospective 0.50. Post-deploy check on zenmemes.com and maintainer comfortable-fit judgment pending. Same R1/P2, single exposed Claude rater.