Cycle v3/hn_theme

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/hn_themeStep 4 complete; acceptance pendingv2 / R1 / P20.65 (Step 4 entry); retrospective 0.60Step 1, Step 2, Step 3, Step 4No parent; v3/thread_port (PR #342) merged

2026-11-19T16:40Z — Standing P2 enrollment. Intake 0.45 after code inspection (no pristine intake), single exposed Claude rater. Step 1 alternatives A 0.30, B 0.45, C 0.80 (not summed). Baseline 7d9b4b4d.

2026-11-19 — Step 1 approved with Option C, name Ochre; ported-thread default deferred (scope v2). Step 2 handoff 0.65, single exposed Claude rater. Baseline a1cefffa.

2026-11-19 — Step 2 approved. Step 3 handoff 0.65 reaffirmed; six stages (0.10, 0.10, 0.10, 0.15, 0.10, 0.08; not summed).

2026-11-19 — Step 3 approved; Step 4 entry 0.65 reaffirmed. Six stages done (retrospective stage work 0.10, 0.08, 0.08, 0.15, 0.08, 0.08). Retrospective cycle scope 0.60; maintainer comfortable-fit judgment pending.