Cycle v3/feedback_completion_prompt

Cycle: v3/feedback_completion_prompt Status: prompt saved; PR #408 open; maintainer acceptance pending Scope: v1; reference R1; protocol P2 Projection: 0.05 (intake and execution entry) Retrospective-cycle-scope: 0.05 Canonical-checkpoints: ../feedback_completion_prompt/feedback_completion_prompt_one_shot.md Parent: follows v3/feedback_completion_apply (PR #406, merged) Acceptance: pending; no accepted-outcome increment

2026-11-24: Intake/entry 0.05 after procedure exposure; pristine intake missing. Single exposed Codex rater; bundled R1 available, hashes not reverified. 2026-11-24: Closeout retrospective 0.05; saved prompt and discoverability link verified. Smoke failures retained; full suite not run. No measured labor or independent rating.

2026-11-24: Handoff complete; implementation 59226ed5b, PR https://github.com/gulkily/v3/pull/408 open and mergeable. Scores unchanged; no merge, deployment or accepted-study-outcome increment.