Cycle v3/favicon_light_theme

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/favicon_light_themeOne-shot complete; review, merge and deployment pendingv1 / R1 / P20.10Record study historyNew cycle; no parent. Comfortable-fit judgment pending maintainer

2026-11-23T06:15:00Z — v3/favicon_light_theme one-shot intake (standing P2 enrollment, no parent, started from the backlog prompt for PF-20261111-B02): projection 0.15, scope v1, starting revision e32bef64. Recorded before implementation inspection; rater exposed only to the item text. Single Claude rater.

2026-11-23T06:22:00Z — execution entry before planning commit c1391b64: revised to 0.10 (one asset and one test assertion; no code path changes).

2026-11-23T06:35:00Z — closeout: delivered scope v1; retrospective 0.08. Maintainer fit and acceptance pending.