Repository source: docs/plans/effort_ledger/favicon_light_theme.md
Cycle v3/favicon_light_theme
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/favicon_light_theme | One-shot complete; review, merge and deployment pending | v1 / R1 / P2 | 0.10 | Record study history | New cycle; no parent. Comfortable-fit judgment pending maintainer |
2026-11-23T06:15:00Z — v3/favicon_light_theme one-shot intake (standing P2 enrollment, no parent, started from the backlog prompt for PF-20261111-B02): projection 0.15, scope v1, starting revision e32bef64. Recorded before implementation inspection; rater exposed only to the item text. Single Claude rater.
2026-11-23T06:22:00Z — execution entry before planning commit c1391b64: revised to 0.10 (one asset and one test assertion; no code path changes).
2026-11-23T06:35:00Z — closeout: delivered scope v1; retrospective 0.08. Maintainer fit and acceptance pending.