Cycle v3/fastmod_bayes_meta

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/fastmod_bayes_metaSlice 1 (Stages 1–4) committed on feat/fastmod-bayes-meta, PR #241; Stage 5 production gate pendingv2 / R1 / P20.45Step 4 summaryNo parent (follows v3/fastmod_meta_score); maintainer acceptance pending

Entries before the 2026-11-15 freeze were written in the original ledger on this branch and moved here when main was merged (2026-11-17), since the original ledger is frozen for appends. Oldest first.

2026-11-11T02:20:00Z — v3/fastmod_bayes_meta Step 1 handoff (standing P2 enrollment, no parent; follows fastmod_meta_score): assessment/checkpoint. Scope v1, recommended Option B in two slices (shadow Bayes meta score and agreement report first, then "local, LLM when unsure"). Starting revision 989f478, R1/P2; R1 hashes not re-verified. Single exposed Claude rater; pristine intake missing. Intake and projected total 0.40; option estimates 0.25/0.40/0.30, non-additive. Await Approved Step 1; planning uncommitted.

2026-11-11T22:20:00Z — v3/fastmod_bayes_meta Step 1 Revision 1: maintainer said production has a lot of existing data and the LLM cannot run now. Checkpoint. Scope v2, recommended Option C in two slices (local scores and agreement report against stored labels; then derived tags and backfill), training on human and stored LLM labels only; Option B fallback moved to follow-up. Projected total 0.40 → 0.35; option estimates 0.25/0.40/0.30 unchanged, non-additive. Same R1/P2, single exposed Claude rater. Await Approved Step 1; planning uncommitted.

2026-11-14T19:15:00Z — v3/fastmod_bayes_meta Step 1 approved: maintainer sent "approved step 1" for Revision 1 (Option C in two slices, scope v2). Branch feat/fastmod-bayes-meta from 459d212; Step 1 approval commit follows this entry. Projected total 0.35 reaffirmed. Same R1/P2, single exposed Claude rater.

2026-11-14T19:30:00Z — v3/fastmod_bayes_meta Step 2 handoff: Step 1 approved and committed (94b70e0). Description/checkpoint: roots only, human and stored-LLM labels, separate local threshold, Fastmod source setting, slice 2 gated on production report. Projected total 0.35 → 0.40 (new understanding: signed source setting, separate threshold, transfer exclusion). Same R1/P2, single exposed Claude rater. Await Approved Step 2; planning uncommitted.

2026-11-14T19:20:00Z — v3/fastmod_bayes_meta Step 2 approved with Revision 1: Russian roots always not meta and excluded from training. Description. Projected total 0.40 reaffirmed. Step 2 approval commit follows this entry. Same R1/P2, single exposed Claude rater.

2026-11-14T19:40:00Z — v3/fastmod_bayes_meta Step 3 handoff: Step 2 approved with Revision 1 (Russian always not meta), committed 6b17a17. Plan/checkpoint eight stages: model, train, score, post detail, production gate, source setting, publish hook and docs, production acceptance. Projected total 0.40 reaffirmed; stage work 0.06/0.08/0.05/0.03/0.02/0.10/0.05/0.02, non-additive. Same R1/P2, single exposed Claude rater. Await Approved Step 3; planning uncommitted.

2026-11-14T20:10:00Z — v3/fastmod_bayes_meta Step 2 Revision 2, approved by the maintainer's request ("yes, please both"): local score sweep task and queued Retrain button. Description. Projected total 0.40 → 0.45. Revision commit follows; Step 3 draft revised. Same R1/P2, single exposed Claude rater.

2026-11-14T20:15:00Z — v3/fastmod_bayes_meta Step 3 Revision 1: sweep task in Stage 3, Retrain button and report in Stage 4, publish failures queue the sweep. Plan/checkpoint. Stage work 0.06/0.08/0.08/0.07/0.02/0.10/0.05/0.02, non-additive. Projected total 0.45. Same R1/P2, single exposed Claude rater. Await Approved Step 3; planning uncommitted.

2026-11-14T20:12:00Z — v3/fastmod_bayes_meta Step 3 approved (Revision 1). Step 3 approval commit follows this entry. Projected total 0.45 reaffirmed. Same R1/P2, single exposed Claude rater.

2026-11-14T20:30:00Z — v3/fastmod_bayes_meta slice 1 handoff: Stages 1–4 committed on feat/fastmod-bayes-meta (40262bc, 894ea40, 8f6233e, 03a546b). Summary. Stage retrospectives 0.05/0.09/0.08/0.08 against originals 0.06/0.08/0.08/0.07; non-additive. Whole-cycle projection 0.45 unchanged. Stage 5 production gate pending with the maintainer. Same R1/P2, single exposed Claude rater.

2026-11-22T23:30:00Z — v3/fastmod_bayes_meta Stage 5 gate failed on production (weak negatives: no threshold at 0.95 precision; 194 disagreements). Offline replay on public data found label noise and length bias. Maintainer approved Step 2 Revision 3 and Step 3 Revision 2: model fix, operator labels file seeded with Claude's labels, five-fold threshold. Projected total 0.45 → 0.55. Revision commit follows this entry. Same R1/P2, single exposed Claude rater.

2026-11-22T23:55:00Z — v3/fastmod_bayes_meta Stage 5 Revision 2 implemented on feat/fastmod-bayes-meta-labels: damped-average model, operator labels file (1,182 seed labels), five-fold threshold. Public-data replay: cross-checked precision 0.95, recall 0.71. Stage 5 retrospective 0.03 (gate failed); Stage 5 Revision 2 retrospective 0.12 against 0.10. Projected total 0.55 unchanged. Production gate retry pending with the maintainer.

2026-11-22T23:13:00Z — v3/fastmod_bayes_meta Step 3 Revision 2 approved explicitly by the maintainer ("approved step 3"). It had been committed in 57990e3 under the earlier approval of the revision; no plan change. Stage 5 Revision 2 is implemented on PR #366; the production gate retry is next. Projected total 0.55 unchanged.