Repository source: docs/plans/effort_ledger/deploy_history_compact.md
Cycle v3/deploy_history_compact
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/deploy_history_compact | One-shot complete; awaiting maintainer merge | v1 / R1 / P2 | 0.10; retrospective 0.10 | record | Follow-up of v3/deploy_rollback after its merge. Acceptance pending |
2026-11-22 UTC — Standing P2 enrollment. Intake and entry 0.10, single exposed Claude rater. Closeout retrospective 0.10. Baseline e2c112ca.